Twelve pitches waiting for a bet in cycle 25
Search, filter and sort the queue the next betting table draws from.
C-25 demand
30team-weeks asked for against 12
7 shaped pitches want the next cycle. 3 are still being shaped.
| State | By | ||||
|---|---|---|---|---|---|
| Multi-harbour accounts A port authority running four harbours keeps four separate logins and four separate bills. | Shaped | Big batch6w | High | Ines Kaur | 2d ago |
| Sensor health board Nobody notices a station has gone quiet until a forecast is already wrong. | Shaped | Small batch2w | Medium | Mei Lindqvist | 4d ago |
| Alert acknowledgement An alert goes out and nobody can tell whether a person saw it. | Bet | Small batch2w | Medium | Ana Vestergaard | 5d ago |
| Admiralty feed import Two harbours send us a weekly CSV that someone pastes in by hand. | Bet | Small batch2w | High | Tom Reddaway | 6d ago |
| Harbour digest, second pass Harbour masters read the digest on a phone at 05:00 and cannot reorder it. | Bet | Big batch6w | High | Ana Vestergaard | 9d ago |
| Public tide widget Harbour websites embed a screenshot of our table and it goes stale. | Shaped | Big batch6w | Low | Rafi Osei | 12d ago |
| Historical replay After a flood, the harbour asks what we predicted and we rebuild it by hand. | Shaped | Big batch6w | Low | Ines Kaur | 18d ago |
| Whitelabel harbour portal One harbour wants our screens under their own brand. | Set aside | Big batch6w | No priority | Ines Kaur | 44d ago |
| Native mobile app The digest is read on a phone, so the ask is a phone app. | Set aside | Big batch6w | No priority | Rafi Osei | 61d ago |
| Station install checklist Every new station install goes differently and the engineer improvises. | Shaping | Small batch2w | Medium | Priya Raman | Not yet |
| Forecast confidence bands We publish a single number for a prediction that is really a range. | Shaping | No appetite yet | Low | Jonas Wilk | Not yet |
| Dredging window planner Dredging contractors ask us for windows and we answer by email. | Shaping | No appetite yet | No priority | Nell Okonjo | Not yet |
Showing 12 of 12 pitches
Still shaping
3 pitches without a settled appetite
Station install checklistSmall batch2w
Every new station install goes differently and the engineer improvises.
Shaped by Priya Raman
Forecast confidence bandsNo appetite yet
We publish a single number for a prediction that is really a range.
Shaped by Jonas Wilk
Dredging window plannerNo appetite yet
Dredging contractors ask us for windows and we answer by email.
Shaped by Nell Okonjo
A pitch reaches the table with a problem, an appetite and its no-gos written down.